1,000+ Electrical Transformers (7.2–34.5 kV, 25–3000 kVA) — UL Evaluated, Certificate of Compliance Available — In Stock & Ready to Ship from Houston, CA & Florida. Contact Us Today!  

BESS Transformers Manufacturer

  • 1-Week Rapid Shipping: Hundreds of units in stock for immediate delivery within one week
  • Up to 500MVA Capacity: Fully customizable solutions supporting up to 345 kV and 500 MVA
  • FM & Global Certified: Strictly compliant with ANSI/IEEE, IEC, CSA, and AS/NZS standards with FM-certified safety
  • 30-Year Reliable Life: High-performance design ensuring a stable operational lifespan of 25 to 30 years

BESS Transformer

As a dedicated BESS (Battery Energy Storage System) transformer manufacturer and supplier, Daelim Transformer focuses its deep technical expertise and decades of industry experience on the evolving energy storage sector:
  • Deep-Rooted BESS Expertise: With over 20 years of experience in transformer design and manufacturing, we have built a profound understanding of the BESS landscape. Our engineers don't just build equipment; they carefully design every parameter—from winding geometry to insulation—tailoring them to the specific heartbeat of your battery storage system to meet even the most complex project needs.
  • Powerful Production & Supply: Whether you are looking at a compact containerized setup or a massive utility-scale power plant, our production capacity of up to 345 kV and 500 MVA covers almost every segment of the BESS market.
  • Global Footprint & Standard Compliance: Operating across two modern facilities spanning over 60,000 m², we ship more than 5,000 units annually to over 30 countries worldwide. We strictly adhere to ANSI/IEEE, IEC, CSA, and AS/NZS standards, ensuring that every unit we deliver is ready to meet the interconnection requirements of its local market.
  • Flexible Solutions for Your Success: We are here to help power producers unlock the full potential of their storage systems through bespoke transformer solutions. By providing meticulous quality certification and strictly following global standards, we ensure your project sails through grid interconnection approvals and remains fully eligible for policy subsidies and financial support
Filter By Certificate
Filter By Primary Voltage Ratings
Standards
See More See Less
See More See Less
See More See Less

Technical Specification of BESS Transformers

BESS Transformer specifications

BESS transformers are available in different configurations, depending on the capacity of the energy storage system, inverter specifications and grid requirements.

Technical characteristics of our BESS transformers:

Technical specification of Daelim Transformer’s BESS transformers

Transformer Parameter

Typical Range

Rated power

1000 kVA – 500 MVA

Low / Medium  voltage (solar plant / inverter side)

400 V – 35000 V

High voltage (power grid side)

Up to 345 kV

Frequency

50 / 60 Hz

Cooling methods

ONAN – ONAF – OFAF – OFWF

Tap changer

DETC ±5%, 21 position OLTC -10% to +15% available

Winding material

Copper or Aluminium

Corrosion Protection Class 

C3 / C4 / C5

Insulation fluid

Mineral oil or natural ester

Installation type

Indoor and Outdoor

Ambient temperature

−40 °C to +50 °C

Standards

IEC – ANSI/IEEE – CSA – AS/NZS

Delivery time

12-16 weeks (standard transformers)

4 to 8 months (custom and large transformers)

Operational life

25 – 30 years

Daelim Transformer’s BESS Transformer Core Features

Robust Core and Winding Design

The transformers are built from high-grade magnetic core materials that minimize losses. Also, this core ensures the integrity of the transformer structure under high loads. The windings are manufactured with a high degree of insulation and with optimized conductor laying geometry. Together, these features ensure stable transformer performance in the demanding environment of battery and renewable interaction with the grid.

Low Environmental Impact

The use of biodegradable oils and high flash point insulation ensures a lower environmental impact of BESS transformers. Also, the proximity of battery systems requires increased fire protection measures for BESS transformers. The oils and insulation materials used in Daelim Transformer BESS transformers are FM-certified, confirming compliance with fire safety and overall performance standards. The entire design of the Daelim Transformer transformer is focused on reducing the environmental footprint throughout the entire lifecycle.

Electrostatic Shielding

Every Daelim Transformer’s BESS transformer is supplied with a complete electrostatic shield between the HV and LV windings. This is a standard, not an optional design. This improves the insulation between the windings, reduces the risk of partial discharges and increases the dielectric strength. It protects the equipment and extends the service life of the transformer.

Sealed & Conservator Tank

The designed service life of BESS transformers is over 20 years. The transformer with a sealed tank and a conservator equipped with an air-isolation system, providing a high level of protection against moisture ingress and environmental contamination.. Units with capacities up to 20 MVA are usually manufactured in a hermetically sealed design, incorporating nitrogen-cushion protection as well as additional devices such as sudden-pressure relays and vacuum gauges. BESS transformers exceeding 20 MW and rated voltages above 50 kV typically employ a conservator-type design. They are equipped with Buchholz relays, winding thermometers and additional smart monitoring devices -such as SEL-2414 and Qualitrol W9.

Fast Delivery Time

In its two production units, Daelim Transformer produces over 5000 transformers per year. Many years of experience in the production of standard and customized units, enables extremely fast delivery of your transformer. We maintain hundreds of BESS transformers in stock, with ratings ranging from 1,000 kVA to 5,000 kVA. No lead time required—contact us today and your transformer can be shipped within one week. Our BESS transformers work on all continents, and are adapted to all the most used standards, which further speeds up the design and transformer manufacturing.

Contact Us

Application Scenarios

BESS transformers play a key role in the renewable energy sector by enabling seamless integration with the distribution and transmission grid. In addition, they can be used in industrial facilities and commercial energy management systems.

Application

Key Challenges

Solutions

Utility scale BESS (Grid connected, large scale plants)

● Bidirectional energy flow requirement

● Load variability

● Higher harmonics

● Grid code compliance

● Transformer windings design handle two-way energy flow

● Split windings configuration for multi inverter support

● Optimized design ensures grid compliance and voltage stability

Hybrid power plants (Solar + Wind + BESS)

● Unpredictable power generation

● Complex power flow management

 

● Robust core & winding design for fluctuating load conditions

● Optimized transformer  impedance and voltage adaptation

Backup power in the commercial/industrial sector

● Smooth transition from primary power supply to batteries

● Energy resilience

● Transformer supports bidirectional energy flow, fast switching

 

Peak demand shaving

● Rapid load fluctuations

● High peak power demand

● High-efficiency transformer design

● High responsitivity

Frequency regulation & other grid services

● Rapid frequency fluctuations

● Strict grid requirements

● High control precision

● Support for dynamic power exchange

 

Microgrids

● Variable load supply

● Switching between primary power and batteries

● Reliability

● Robust design for transient loads and faults

 

Transformers Configured for Various Projects

Each has specific requirements and operating conditions. Daelim Transformer’s engineering team responds very quickly to inquiries and project specifications, with design recommendations and a price estimate. For standard small to medium-sized projects, the delivery time is 8-12 weeks.

The following features are adaptable and allow the transformer to be used in a variety of conditions, industries and environments:

Electrical

Environmental

Logistics

Utility scale BESS units are commonly deployed in 2-hour and 4-hour configurations. These high-density storage systems unit typically interfaces through a dedicated step-up transformer with multiple low-voltage outputs. Such combinations provide optimized load sharing, scalability, and resilience, while addressing the demanding operating conditions of inverter-based systems.

From a design perspective, these are most often pad mounted transformers for outdoor use with robust thermal and dielectric performance. They are often supplied with features such as tap changers, surge protection and systems for monitoring temperature, pressure and oil level.

The use of durable enclosures, adequate monitoring, and multi-winding configurations ensure the compatibility of BESS transformers with fast-cycling and highly demanding grid-scale energy storage applications.

Solar & BESS project in Southern California

Projects that chose Daelim Transformer BESS transformers

Project Type

What Client Needed

What Daelim Transformer delivered

Key Outcomes

Utility scale grid BESS

 

● High MVA rating transformer

● OLTC regulation

● Utility interconnection

● IP56 protection level

● 146 MVA BESS transformer

● 21-position OLTC

● Low noise (70.2 dB at 1m) transformer with IP56 protection

● IEC/AS/IEEE compliant

● Stable and precise voltage regulation for grid support

● Reduced downtime due to weather-resistant design

● Seamless utility interconnection

Containerised BESS transformer

● MV connection

● Compact design

● Fast Factory Acceptance Testing

● Complied with California Electrical Code 450

● Pad mounted transformer

● FAT report done within 3 business days

● Complied with all required standards

● Pad mounted design enables safe installation

● Reliable and standardized performance

● Simplified MV connection

BESS + solar hybrid

● Handle solar system and battery inverter on one transformer

● Suitable in harsh environmental conditions

 

● 4.4MVA/4.8 MVA BESS transformer

● Wide operating ambient temperature range

● Low energy losses

● Using oils with a low pour point

● Integrated support for hybrid systems in one transformer

● Optimized performance

● Improved overall system efficiency

● Reduced oil viscosity issues at low temperatures

Manufacturing & Quality Assurance

In order for electricity to be stored in a BESS, or sent to the grid during periods of power shortage, all elements need to meet certain standards and norms. Utility interconnection approvals, financial and insurance aspects of the project require documented transformer quality. Daelim Transformer’s transformers undergo a rigorous factory acceptance program, which ensures compliance with standards, quality of manufacture, and transformer performance.

Production Capacity

Quality Assurance Programme

Two factories with an area of ​​over 60,000 m² .

ISO 9001:2015 across all manufacturing stages

Transformer manufacturing capacity – 345 kV/500 MVA

No-load and load loss measurement

300+ employees in both facilities

Lighting impulse withstand

5000+ units exported worldwide annually

Full Factory acceptance test within 3 business days

500+ units in stock at China/USA for fast shipment

DGA oil analysis is standard

Complied with global standards such as ANSI / IEEE / IEC / CSA / AS / NEMA

Electromechanical tests according to valid certifications

BESS Transformer Packaging, Shipping & Logistics

The success of any energy project, including the delivery of BESS transformers, depends on the quality of workmanship and safe and timely delivery. Damage in transit is one of the main reasons for project delays.

Daelim Transformer’s method of packaging and preserving transformers during transport practically eliminates this risk. The company provides the client with logistical support during transport, using both road and sea transport.

Our transformers are carefully prepared, protected, and equipped for safe transportation, ensuring they arrive on site in perfect condition and ready for operation. The process of preparing the transformer includes:

BESS Transformer Packaging, Shipping & Logistics

Warranty & After-Sales Service Support

The lifespan of batteries is 10-15 years, and of BESS transformers over 20 years. With battery replacement, such a project can operate for decades. Transformer support should last throughout this period – not just after commissioning and shortly thereafter. Daelim Transformer offers end-to-end support for your BESS project, covering all stages and including:

  • The warranty covers all manufacturing defects with a responsive technical team during the warranty period.
  • Operating and maintenance instructions along with project documentation with all outline drawings, nameplate drawing, schematic, wiring diagrams and product data sheets.
  • Spare parts are dispatched typically within a few working days and international delivery depending on logistics and destination.
  • SCADA integration support – our engineers work directly with the BESS integration team during commissioning with the intelligent monitoring system.
  • DGA oil analysis interpretation – advice and action steps, not just raw numbers.
  • Technical support for all questions concerning our transformers.

Get a Transformer Quote in 2 Days

Daelim Transformer has developed excellent BESS transformer solutions through many years of experience that ensure constant reliability in operation. We recognized the importance of supporting next-generation energy systems with advanced and efficient transformer solutions.

Send us your project specification – rated MVA or kVA, primary and secondary voltage, frequency, applicable standard, basic environmental performance and grid-code requirements. Daelim Transformer’s engineering team will get back to you with a firm-price quotation with the technical parameters of the future transformer within 48 hours.

You don’t have to wait weeks to get feedback. Our expert qualified team will review your specification and get back to you with all the necessary technical and financial details for your project.

FAQ

Is a BESS transformer really necessary, or can a standard unit work in electricity storage projects?

A standard unit will work, but for a limited period. Its insulation will deteriorate faster and early failures can be expected. Daelim Transformer’s BESS transformers are designed for 20+ years of operation. They are built to withstand harmonic voltages, transient voltages, and sudden load changes

It depends on the design specifics and the size of the transformer. Standard configurations of small and medium sizes can be delivered in 8-12 weeks. Custom projects: 10-16 weeks. Large transformers are delivered in 6-8 months, while very large units require more time. Transformers with standard stock specifications can be shipped within one week.

A double-split winding transformer enables multiple PCS units to share one transformer while reducing harmonic distortion through phase-shifted winding arrangements. This can lower system complexity, reduce equipment costs, and in some cases eliminate the need for additional harmonic filters.

Get A Quote

Contact Us