2600 kVA Pad Mounted Transformer For Crypto Mine In Kansas

2600 kVA Pad Mounted Transformer

This morning, I was delighted to receive on-site photos of the pad-mounted transformers from the customer. These transformers play a pivotal role in a significant project unfolding at a 20MW crypto mining site located in Kansas, USA. Comprising a total of 5 sets of 2600 kVA pad-mounted transformers, all UL-listed, these critical components are strategically deployed at the site. As of now, 3 sets have already been successfully installed on-site, with plans for imminent power activation. Allow me to provide a detailed overview of this project.

Contact Daelim Transformer
Pad Mounted Transformer Specifications
Type Loop Feed Pad Mount Transformer
Standards IEEE Std 
Rating 2600 kVA
Primary Voltage 13800 Delta
Secondary Voltage 480GrdY/277
Frequency 60Hz
Vector Group Dyn1
Winding Material Aluminium
Load Loss At Rated Voltage 21000W
No Load Losses 2960W
Impedance 5.75%
Altitude ≤1000m
No. Of Tap Position 5
Color Munsell
Get Price
Pad Mounted Transformer Specifications
Production
Production
Package
Package
Cable Entrance Compartment
Cable Entrance Compartment

Requirements and Daelim Transformer Solution

In October 2023, Daelim Transformer received an inquiry from a customer to purchase transformers for their 20MW Bitcoin mine in Kansas. The power grid lines are rated at 13.8kV, while the mining equipment requires a voltage of 480V. Leveraging our extensive experience in numerous crypto mining projects across North America, our engineering team swiftly proposed the optimal solution: 5 units of 2600 kVA pad-mounted transformers. The selection of pad-mounted transformers was based on their ease of installation and minimal maintenance requirements. Moreover, the 2600 kVA capacity was chosen to help the customer minimize procurement costs and maximize economic benefits.

Customer Satisfaction

When Daelim Transformer offered this solution to the customer and delineated its advantages, the customer commented on Daelim Transformer's professionalism, considering it one of the most remarkable suppliers they have dealt with. They expressed high recognition and trust towards both us and the proposed transformer solution. Following this, in November, our engineering team concluded the design drawings and validated them with the customer. The customer expects us to complete the production of the transformers by the end of March 2024.

Execution Excellence

Daelim Transformer's procurement, production, and ancillary departments demonstrate exceptional efficiency. Production was successfully concluded on January 31, 2024, within a remarkably brief 10-week timeframe—8 weeks ahead of the customer’s initial expectations. This outstanding performance underscores Daelim Transformer's commitment to exceeding client anticipations through timely and seamless operations, ensuring smooth delivery throughout February.

Learn more about Pad Mounted Transformer

Quality Assurance and Reliability

As a professional pad mounted transformer manufacturer, Daelim Transformer has a full range of UL listed products, including not only UL/cUL, but also CSA, CESI, FM and other certificates as well as third-party product testing reports. Such rigorous adherence to industry standards underscores our unwavering dedication to enhancing the safety, reliability, and quality of our transformer solutions.

Furthermore, our strategically located warehouse in Houston, USA, maintains a substantial inventory of transformers, facilitating immediate dispatch for urgent projects. Contact us for specific transformer inventory information.

Daelim Transformer Projects

Daelim Transformer Custom 1500 kVA Pad Mounted Transformer for Canada
1000 kVA Pad Mounted Transformers For Jamaica Market
2600 kVA Pad Mounted Transformer for Cryptocurrency Mining
Single Phase Pole Mounted Transformer For Guyana
4000 kVA Three Phase Power Transformer For Canada
230 kV Three Phase Power Transformer For USA Market
Single Phase Pad Mounted Transformer For USA Utility
Canadian 69 kV Substation Transformer Project
Pad Mounted Transformer for BESS System 4.0 MVA in Riverside County, California
2000 kVA Oil immersed Substation Transformer For Portugal Market
2550 kVA Pad Mounted Transformer For Data Center in Mexico, Missouri
2000 kVA Pad Mounted Transformers for Canadian Utility
4500 kVA Substation Transformers for Australian Mining Site
Supply of 37.5 kVA Single Phase Pad Mounted Transformers for Canadian Utility
500 kVA Distribution Transformer for the Greek Market
1750 kVA Pad Mounted Transformer for the Dominica 
Three-Phase Power Transformers for Bitcoin Mining Facility in Texas

Related Article

2550 kVA Pad Mounted Transformer For Data Center in Mexico, Missouri

Today, we're excited to showcase Daelim Transformer's involvement in a project supplying four 2550 kVA pad mounted transformers tailored for a data center located in Mexico, Missouri. Data centers, known for their substantial power demands, require reliable solutions to ensure seamless operation during peak electricity usage.

2000 kVA Pad Mounted Transformers for Canadian Utility

Daelim Transformer is pleased to announce its contribution to a utility project in Toronto, Canada, involving the supply of two units 2000 kVA pad mounted transformers. These transformers are integral to enhancing the power infrastructure in the region. The project demands adherence to CSA standards, with a stringent delivery deadline of 10 weeks to meet the urgent needs of the client.

Supply of 37.5 kVA Single Phase Pad Mounted Transformers for Canadian Utility

Today, we are excited to introduce a project undertaken by Daelim Transformer aimed at supplying transformers to a Canadian utility. This project involves the delivery of 80 units of 37.5 kVA single-phase pad mounted transformers, specially designed to meet the utility's requirements. With a high voltage (HV) rating of 24940GRDY/14400 V and a low voltage (LV) rating of 240/120 V, these transformers are vital components in the utility's infrastructure.

1750 kVA Pad Mounted Transformer for the Dominica Market

Today, we're excited to present a transformer project tailored for the Dominican market. Our 1750 kVA pad mounted transformer is designed to meet the specific requirements of our clients in Dominica. This step-down transformer boasts a primary voltage of 13.8 kV and a secondary voltage of 480Grdy/277V, adhering to the IEEE C57.12.34 standard. With its robust features and reliable performance, this transformer is set to enhance the power distribution infrastructure in Dominica.

2600 kVA Pad Mounted Transformer for Cryptocurrency Mining

Daelim Transformer successfully provided three customized 2600 kVA pad mounted transformers to power a state-of-the-art cryptocurrency mining facility in Texas, USA. Our transformers were meticulously designed to meet the unique demands of the mining operation, ensuring seamless power distribution with unwavering reliability and efficiency.

2 MVA Pad Mounted Transformer for Utility

Behold the backbone of Canada's utility infrastructure—the 2MVA pad mounted transformer. With a primary voltage of 4160Grdy/2400V and a secondary voltage of 800GrdY/461V, this transformer stands as a testament to efficiency and reliability in power distribution. Crafted in strict accordance with CSA standards and CAN/CSA802.1 energy efficiency guidelines, it embodies the pinnacle of engineering excellence.

Quote Now


Please Write your message, ask for price, we will reply you soon, thanks